A routine inspection and a thorough examination are two different checks on the same lifting equipment, and confusing them is a common lifting-safety mistake. A routine inspection is a planned in-service check that looks for visible wear, damage and deterioration so problems are caught early. A thorough examination is a deeper, systematic examination by a competent person, carried out to find defects that are, or could become, dangerous.

Scope: What follows compares the two checks, the intervals each one follows, and what a proper examination report must contain. It teaches the practice and the law behind it. It is not a legal determination for any single workplace, a technical procedure for a named machine, or a substitute for a competent person's judgement on the equipment in front of them.

Key takeaways

  • A routine inspection looks for deterioration early; a thorough examination judges whether the equipment is safe to keep using.
  • In the UK, LOLER requires thorough examination every 6 months for lifting people and accessories, and every 12 months for other lifting equipment.
  • Only a competent person may carry out a thorough examination, and the written report is a legal record.
  • A failed examination means the equipment stops until the defect is put right.

What a routine inspection is

Infographic in four quadrants showing a hook and latch, wire rope, chain sling and brake as the four parts a routine lifting inspection checks
What a routine inspection is.

Under the UK's Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), lifting equipment may need inspection at suitable intervals between thorough examinations. HSE leaflet INDG422 describes them as visual and functional checks, carried out regularly, for example weekly, monthly or quarterly, on machinery such as cranes. Scope and frequency follow the competent person's opinion and the manufacturer's guidance.

An inspection looks at the parts that wear, move or carry the load: hooks, ropes, chains, slings, brakes, controls and safety devices. The inspector records what was checked and what was found, and the record is kept until the next inspection report is made. Chains and slings normally need no separate inspection, provided they are examined at the right interval and checked before use.

Intervals are set by risk, not habit. Equipment in wet, abrasive or corrosive conditions, equipment used intensively, and equipment whose failure would drop a load over people all justify shorter intervals. The schedule belongs in the examination scheme. The Safety Institute's guide to safety inspection vs audit explains how a planned inspection differs from an audit of the whole system.

What a thorough examination is

Infographic in five steps showing scope, visual examination, functional testing, defect judgement and written report as the stages of a thorough examination
What a thorough examination is.

HSE leaflet INDG422 defines a thorough examination as a systematic and detailed examination of lifting equipment by a competent person to detect any defects that are, or might become, dangerous. The competent person sets the scope, and testing is included where appropriate: functional tests, load tests or non-destructive examination of critical parts.

A competent person has the practical and theoretical knowledge and experience to detect defects and judge their importance. They must be independent and impartial, and must not be the person who maintains the same equipment, since they would then assess their own work.

In the UK, regulation 9 of LOLER requires thorough examination before first use, after assembly at a new site, at regular intervals in service, and after exceptional circumstances such as damage, failure, long disuse or a major change in use. Equipment leaving an employer's undertaking must carry proof of its last required thorough examination.

Inspection vs thorough examination at a glance

Infographic as a two-column table comparing inspection and thorough examination on purpose, person, frequency, depth, testing and record
Inspection vs thorough examination at a glance.

The two checks answer different questions: an inspection asks whether deterioration is appearing, while a thorough examination asks whether the equipment is safe to keep using, and proves the answer in a signed report.

CriterionRoutine inspectionThorough examination
PurposeFind deterioration earlyDetect defects that are, or could become, dangerous
Who carries it outA competent person, often in-houseA competent person, independent of maintenance
How oftenAt suitable intervals, for example weekly to quarterlyAt least every 6 or 12 months, or under an examination scheme
DepthVisual and functional checksSystematic and detailed
TestingFunctional checks during useTesting where appropriate
Record producedInspection record, kept until the next reportSigned report, a legal record
Legal basis in the UKLOLER regulation 9(3)(b); PUWER regulation 6LOLER regulation 9 and Schedule 1

Neither check replaces the other. Without thorough examination there is no independent verdict on safety, and without inspection between visits deterioration grows unseen for six or twelve months.

How often each check happens

Infographic as a three-stage timeline showing 6 months for people and accessories, 12 months for other lifting equipment, and immediate examination after exceptional circumstances
How often each check happens.

Intervals depend on the equipment and the jurisdiction.

Equipment and jurisdictionThorough examination interval
UK (LOLER): equipment lifting people, and lifting accessoriesAt least every 6 months
UK (LOLER): all other lifting equipmentAt least every 12 months
UK (LOLER): any equipment under an examination schemeAs the scheme directs
UK (LOLER): after exceptional circumstancesImmediately
USA (OSHA 29 CFR 1926.1412): cranes in constructionComprehensive inspection at least every 12 months, plus shift and monthly inspections; general industry: frequent and periodic inspections (29 CFR 1910.180)
Pakistan (Factories Act 1934, s. 33): cranes and other lifting machineryAt least once every 12 months
Pakistan (Factories Act 1934, s. 33-A): hoists and liftsAt least once every 6 months

The UK intervals are minimum frequencies: "at least every" 6 or 12 months. A competent person may shorten them, and an examination scheme may set different intervals where a rigorous risk assessment supports it. In the United States, OSHA's construction standard adds event-triggered inspections after modification, safety-related repair, assembly and long idle periods, as the OSHA fact sheet on crane inspection describes.

What a thorough examination report must contain

Infographic in a two-by-two grid showing equipment identity, safe working load, defects found and next due date as the four essentials of an examination report
What a thorough examination report must contain.

In the UK, the competent person must report in writing to the employer as soon as practicable. Schedule 1 to LOLER lists what the report must contain, and a report missing any of it should not be accepted.

  • Name and address of the employer, and the address of the premises.
  • Particulars identifying the equipment, including its date of manufacture where known.
  • Date of the last examination, and the safe working load for the configuration examined.
  • For a first examination, whether it was installed correctly and would be safe to operate.
  • For later examinations, whether it was a 6-month, 12-month, scheme or exceptional-circumstances examination.
  • Any part with a defect that is, or could become, a danger, and a description of it.
  • Any repair, renewal or alteration required, and, for a defect that could become dangerous, when it could become a danger.
  • Latest date for the next examination, details of any tests, and the examination date.
  • Name, address and qualifications of the person making the report, and who signs it on their behalf.
RecordHow long to keep it (UK, INDG422)
First-use examination, lifting equipmentUntil the employer stops using the equipment
First-use examination, lifting accessoriesTwo years
In-service thorough examinationUntil the next report or two years, whichever is later
In-service inspections and testsUntil the next report

Keep the report where the next inspector, the operator and the supervisor can find it. A report filed and never read wastes the examination: the defects, repair dates and next due date are the working parts.

When defects are found

Infographic in a four-quadrant layout showing tell the employer, record the defect, stop the equipment and report serious defects as the four actions when defects are found
When defects are found.

A defect that is, or could become, a danger must be reported to the employer immediately and confirmed in the report. The report separates defects that are already dangerous from defects that could become dangerous, giving when the second kind could become a danger and the repair it needs.

If the defect involves an existing or imminent risk of serious personal injury, the competent person must also send the report to the enforcing authority, in the UK the Health and Safety Executive or the local authority, even if the defect is remedied immediately. HSE's guidance is blunt: not reporting a defect because it was fixed on the spot disguises a potentially dangerous situation.

The employer must act on every defect reported. Equipment with a serious defect must be taken out of service at once until the defect is put right; in the UK, continuing to use it breaks the law. A defect with a repair timescale must be repaired or the equipment replaced within that time, and must not be used after the deadline unless the defect has been put right.

Stop the lift: if a defect appears during a lift, stop the lift, follow the site's authorisation and emergency arrangements, and involve the competent person at once.

Pre-use checks, maintenance and thorough examination working together

Infographic in a three-stage sequence showing pre-use check before each lift, planned maintenance on schedule, and thorough examination at set intervals
Pre-use checks, maintenance and thorough examination.

Pre-use checks sit below both checks. Before each use, the operator looks over hooks, ropes, slings, controls and safety devices for obvious damage. HSE's guidance is explicit: pre-use checks do not replace thorough examination, and a clean check never extends an overdue examination date. Where a permit to work is needed, the pre-use check should be recorded in it, so authorisation rests on evidence, not memory.

Planned maintenance is the third leg. In the UK, PUWER requires maintenance of all work equipment, including lifting equipment: lubrication, adjustment, replacement of worn parts and topping up fluids. A thorough examination may reveal poor maintenance, but it is not a substitute for it, and maintenance must not wait for the next examination.

A forklift shows the split: LOLER covers the lifting mechanism, while regulation 6 of PUWER covers the brakes, lights and other non-lifting parts. A risk assessment matrix helps set the shortest interval for each check on a given machine.

Common mistakes seen on site, all avoidable:

  • Treating a pre-use check as a thorough examination.
  • Lifting with an examination date already passed.
  • Letting the maintainer examine their own work.
  • Filing the report without reading the defects or the next due date.
  • Using equipment with no safe working load marked, or loading beyond it.
  • Ignoring a defect that could become dangerous because it is not dangerous yet.

Lifting equipment checks in Pakistan

Infographic in a two-column table comparing the Factories Act 1934 examination intervals with the Punjab Occupational Safety and Health Act 2019 general duties
Lifting equipment checks in Pakistan.

Pakistani law does not copy LOLER, so the UK intervals must not be quoted as Pakistani law. For factories, the Factories Act 1934 sets its own figures: section 33 requires cranes and other lifting machinery to be thoroughly examined by a competent person at least once every 12 months, with a register kept.

Section 33-A requires hoists and lifts to be examined at least once every 6 months by a competent person authorised by the Chief Inspector, with a copy of the register sent to the Chief Inspector. The safe working load must be plainly marked, and never exceeded. The text was read from a published reproduction of the Punjab-adapted Act; the Gazette remains authoritative.

The Punjab Occupational Safety and Health Act 2019 (Act IV of 2019) adds a general duty: it defines machinery to include a lifting machine and a lifting vehicle, and requires every employer to keep machinery safe and without risks to health. The Act allows rules on testing and inspecting machinery, but sets no examination interval of its own. Outside Punjab, confirm the applicable provincial law before quoting any interval as a legal duty.

Where no interval is prescribed, the sound management practice is to adopt the 6-month and 12-month pattern as the site's own standard, with a competent person drawing up the scheme. That borrows the UK and factory-law intervals as practice, not as Pakistani law. BS 7121-1:2016, the UK code of practice for the safe use of cranes, gives the competent person a reference for writing that scheme.

The following record is fictional: a 5-tonne overhead crane at a Rawalpindi fabrication shop, reference LE-014.

FieldRecord LE-014
Reference and boundaryOverhead crane OHC-04, 5-tonne safe working load, fabrication bay 2, examination due 29 November 2026
Observed factsHook latch spring weak and slow to close; wire rope shows broken wires and flattening near the hook; limit switch and brakes pass
People affected and possible harmOperators and riggers in bay 2; a failed latch or rope could drop the load on people below
UncertaintyInternal rope condition cannot be judged visually; the rope is cut back and re-terminated for a closer look
Decision and next stepCrane stopped at once; rope replaced and latch repaired; re-examination before the crane returns to service
Verification questionDoes the re-examination report record the new rope and the next due date, and does the next monthly inspection check the new rope first?

Learners wanting structured training can compare the current syllabus of the ICTQual Level 2 Award in Lifting and Rigging with their needs.

Editorial transparency: Text prepared with AI assistance; linked primary sources checked on 29 November 2026. CMS author attribution is retained and personal authorship or review by Badar Javed has not been verified for this piece. No independent human fact-check or qualified practitioner review is recorded. Teaching examples and imagery are illustrative, not accounts of client work.

Frequently asked questions

Decisions for an actual lift must follow the site procedure and the competent person's assessment.

Can the crane operator carry out the thorough examination?

No. In the UK the examination must be done by a competent person independent of routine maintenance, able to detect defects and judge their importance. The operator's job is the pre-use check before each lift, and reporting anything that looks wrong.

What is an examination scheme?

A scheme drawn up by a competent person setting out the parts to be examined, the techniques and tests to be used, and the intervals between examinations for a specific item of equipment. It may set intervals different from 6 or 12 months where a rigorous risk assessment supports it, and it is reviewed at each thorough examination.

How long must examination reports be kept?

In the UK, a first-use report is kept until the employer stops using the equipment, or two years for accessories. An in-service report is kept until the next report is made or two years, whichever is later. Inspection records are kept until the next inspection report is made.

Does Pakistani law require thorough examinations?

For factories, yes: the Factories Act 1934 requires cranes examined every 12 months and hoists and lifts every 6 months, with registers kept. For other workplaces, the Punjab Occupational Safety and Health Act 2019 sets a general duty for safe machinery without naming an interval, so confirm the applicable provincial law and adopt a 6- and 12-month practice as the site's own standard.